top installation

Discussion of TABC-related matters
Post Reply
User avatar
jagman2
Posts: 59
Joined: Fri Aug 07, 2020 12:35 pm

top installation

Post by jagman2 » Sat Jul 10, 2021 2:52 am

hello, i am installing a new hood on my TC and need to know the spacing dimension of the screw and cup washers
used to hold the bottom rear of the deck to the rear hood rail. it came with 9 screws and cup washers and 2 lift
the dot fasteners. i presume the lift the dot fasteners are at the very ends of the row. not sure exactly the placement of the lift the dot fasteners. any help will be greatly appreciated. cheers

User avatar
antijam
Posts: 171
Joined: Mon May 19, 2014 1:54 pm
Location: Gloucestershire UK.

Re: top installation

Post by antijam » Sat Jul 10, 2021 4:05 am

According to the Moss Top Installation Hints the 9 screws should be pitched at 5" intervals.

This piccie shows the right side termination of the hood securing strip on my car.....
P1370304.JPG
The final fixings of the hood to the tack rail are 'dot snaps' at each back corner. These are released to fold and stow the hood.

Tom Wilson
Posts: 387
Joined: Mon Jan 07, 2013 4:02 pm
Location: Zionsville, Indiana USA

Re: top installation

Post by Tom Wilson » Sat Jul 10, 2021 4:27 am

As it was done originally:
13 flanged screw cup washers
4 #8 x 3/4" slotted countersunk wood screws
9 #8 x 5/8" slotted countersunk wood screws.
2 lift the dot snap screw studs and snap assemblies.

The 3/4" screws are used to attach the webbing strips and top to the back rail.
The snap screw studs are used at the front corners of the rail.
Space the balance of them evenly across the back.

No Lift the Dot fasteners were used originally on the hood.

Tom Wilson

User avatar
jagman2
Posts: 59
Joined: Fri Aug 07, 2020 12:35 pm

Re: top installation

Post by jagman2 » Sat Jul 10, 2021 5:33 am

thank you for the info, i now can proceed. cheers

Post Reply